THE PRACTICAL ANSWER
Review the EPC, letting scope, exemption evidence and proposed lease before renewal. EPC validity, current MEES compliance and longer-term improvement planning are different checks and should be recorded separately.
Current MEES minimum: EPC E for qualifying lettings, unless exempt. Domestic equivalent EPC C for October 2030 is announced policy requiring implementation. Commercial EPC B from 2031 for buildings over 1,000m² is a proposal requiring legislation.
Check the current policy summaryHOW THIS GUIDE IS REVIEWED
MEESCompliance checks the jurisdiction, separates current law from announced policy and links material regulatory statements to official guidance. Illustrative scenarios are not presented as customer results or legal advice.
Define the decision before requesting the certificate
A commercial lease renewal can bring certificate, letting, consent and improvement questions together. Start by identifying the actual transaction and premises: renewal, new letting, acquisition, assignment or subletting. Do not assume those events have identical consequences.
An EPC assessment records the agreed building scope; a MEES review addresses a defined compliance question. The lease may raise separate questions about responsibilities, permissions or funding. Tell the office which output your adviser or transaction team needs so the right brief can be discussed.
Assemble the EPC and premises evidence
Provide the existing certificate reference, date and recommendation report. Mark the accommodation on an available plan, including separate units and relevant shared services. Explain changes to layout, fit-out, occupation or fixed systems since the assessment.
A certificate for a similarly addressed property is not enough to establish the correct scope. Ask the assessor to clarify which accommodation the document covers and what evidence or access is missing. Identify the building manager who can supply central-system information where the tenant does not hold it.
Keep today's MEES question distinct from future plans
Check whether the property and letting fall within current non-domestic MEES rules, the recorded rating and any relevant exemption evidence. A future investment target is a separate planning question. Use the dated regulation tracker to distinguish enacted duties from commercial proposals.
Record the scope of any review in writing. Identify assumptions and unresolved questions rather than treating a certificate band or an unverified exemption statement as the whole answer. Ask the appropriate adviser to resolve any legal uncertainty before relying on it in the transaction.
Current requirements and proposed changes
Agree who can authorise and fund any works
Identify the landlord, tenant and managing-agent contacts involved in consent, access and quotations. The lease and proposed arrangements need to be examined before deciding who pays or who can instruct a contractor. Do not infer an obligation from a generic property guide.
If improvements are being considered, distinguish assessment, modelling, technical investigation and physical works. Itemised quotes should identify dependencies, disruption and what evidence will be supplied. Ask how changes to the scope will be approved and how the agreed result will be reviewed.
Questions about landlord and tenant responsibilities
Plan the measures before commissioning works
Set an achievable evidence and access timetable
Start with the transaction deadline and work backwards through the required decisions. Identify missing documents, site access, building-manager availability and any permission needed for investigation. Agree with your advisers which items are needed at each stage.
Send the office the real deadline and constraints. We confirm scope, quote and assessor availability before booking; an enquiry acknowledgement does not reserve a slot or guarantee completion by a requested date. Escalate uncertainties early instead of leaving them until the transaction is ready to proceed.
Prepare for the assessor visit
Retain a decision file after the transaction
Keep the EPC, relevant review output, agreed scope, quotations, permissions and improvement records with the property schedule. Assign responsibility for the next review and record the outstanding questions. For a portfolio, use the same fields across properties so deadlines and evidence gaps can be compared.
Only treat an assessment, review or project as completed when the agreed output has been delivered and checked. A booked visit, accepted quote and lodged certificate are different stages. This makes the next lease or improvement decision easier to prepare.
YOUR PROPERTY ACTION SHEET
Prepare the commercial lease review.
Tick what you have ready and save the list for your next conversation. Missing information is a useful question to bring.
0 of 6 items ready
Ticks stay in this page and are not sent to the office. Saving downloads a text checklist to your device; it does not submit an enquiry.
Check the commercial letting position before committing to works.
Share the existing commercial EPC, property use and tenancy decision. We can scope a review of current obligations, exemptions and practical improvement evidence.
Review commercial MEES support