Commercial MEES When Assigning or Subletting a Lease: EPC Duties, Landlord Consent and Compliance Risks

Property professionals exchanging keys beside a MEES-branded review folder
Commercial MEES When Assigning or Subletting a Lease: EPC Duties, Landlord Consent and Compliance Risks

THE PRACTICAL ANSWER

Before an assignment or subletting, identify the premises involved, the current certificate and the proposed transaction. Ask the transaction adviser and an appropriate assessor to resolve EPC scope and MEES duties before relying on the existing file.

Policy context · England & Wales

Current MEES minimum: EPC E for qualifying lettings, unless exempt. Domestic equivalent EPC C for October 2030 is announced policy requiring implementation. Commercial EPC B from 2031 for buildings over 1,000m² is a proposal requiring legislation.

Check the current policy summary

Commercial lease assignments and subletting arrangements often begin as straightforward property transactions. An existing tenant wants to leave early, another business is prepared to take over the space, or an occupier has more floor area than it needs and wants to sublet part of the premises.

The legal paperwork may be familiar to the landlord, agent and solicitor, but the energy-compliance position is frequently treated as an afterthought.

That can be a mistake.

An assignment of a commercial lease can require an Energy Performance Certificate, and subletting can also trigger an EPC requirement. At the same time, the property may already be subject to the Minimum Energy Efficiency Standards, commonly known as MEES, which currently require relevant privately rented non-domestic properties in England and Wales to achieve at least EPC E unless a valid exemption applies. (GOV.UK)

The difficulty is that these requirements do not operate as one simple rule. The fact that an EPC exists does not automatically mean the property is MEES compliant. A valid EPC could show an F or G rating. A whole-building EPC may not necessarily be the correct certificate for the particular part being sublet. An exemption may have existed historically but may no longer be valid. The premises may also have changed materially since the current EPC was prepared.

For that reason, landlords and managing agents should treat an assignment or subletting request as a trigger for a proper compliance review rather than simply asking, “Do we have an EPC somewhere on file?”

This guide explains how commercial lease assignment, subletting, EPC requirements and MEES interact, where problems commonly arise, and how landlords, tenants and property managers can deal with them before they delay a transaction.

Why Lease Assignment and Subletting Can Create an EPC Issue

The starting point is the government’s non-domestic EPC guidance.

It states that the sale of an interest in a building is treated in the same way as the sale of the building itself for EPC purposes, and specifically says that an EPC is required for the assignment of a lease where the leasehold interest is being passed to another person. The same guidance also states that subletting a building requires an EPC to be provided. (GOV.UK)

That is important because it means an existing commercial tenancy does not automatically remove the EPC issue.

Consider a business that has occupied an office for six years under a ten-year lease. The company relocates and finds another business prepared to take over the remaining four years. The underlying building has not changed ownership, but the leasehold interest is changing hands. That assignment can still bring the EPC requirement into the transaction.

Subletting creates a similar issue. If a tenant occupies three floors but wants to underlet one floor to another business, the new arrangement involves renting space to another occupier. The EPC position for that particular accommodation then needs to be considered.

This is where many landlords and tenants encounter the first complication: the relevant EPC should generally reflect the accommodation actually being sold or rented. Government guidance specifically recognises that non-domestic buildings can have multiple tenancies, different lease agreements, subletting arrangements and mixed uses. (GOV.UK)

In a simple detached warehouse occupied by one tenant, the answer may be relatively straightforward. In a multi-let office with shared HVAC, several floors, common areas and different lease boundaries, it can be considerably more complicated.

Assignment, Subletting and MEES Are Related — But They Are Not the Same Question

It is useful to separate EPC transaction requirements from MEES compliance.

An EPC requirement asks whether an Energy Performance Certificate must be provided for the building or accommodation involved in the transaction.

MEES asks whether the relevant privately rented property can legally continue to be let at its current energy rating.

Under the current non-domestic MEES regime in England and Wales, relevant privately rented non-domestic property must generally achieve at least EPC E unless a valid exemption applies. Since 1 April 2023, that requirement has applied to existing relevant tenancies as well as new lettings. (GOV.UK)

This distinction matters because a property could have a perfectly valid EPC and still present a MEES problem.

Imagine an office with an EPC produced three years ago. The certificate is therefore still within its normal validity period. But the rating is F.

The certificate itself is not the problem. The rating is.

If the property falls within the non-domestic MEES regulations and no valid exemption applies, the landlord needs to understand the compliance position regardless of whether the EPC document itself remains valid.

That is why an assignment can suddenly expose a problem that has existed quietly in the background for some time.

A solicitor requests the EPC as part of the transaction. The landlord retrieves it. Someone notices the F rating. The assignment is due to complete in three weeks. What had looked like a routine consent process now requires an urgent MEES review.

A much better approach is to identify the issue before the property transaction becomes time-critical.

Our MEES Audit service is designed around exactly that principle: establish what the property’s current position actually is before deciding what action is required.

What Actually Happens in a Commercial Lease Assignment?

A lease assignment involves an existing tenant transferring its leasehold interest to another party.

The outgoing tenant is usually the assignor, while the incoming tenant is the assignee. The exact legal mechanics depend on the lease and transaction documents, and GOV.UK notes that whether a tenant can pass a commercial lease on depends on the lease terms and generally requires landlord permission. (GOV.UK)

From an energy-compliance perspective, the important point is that the incoming tenant is taking over the existing leasehold interest.

Suppose an occupier leases a 7,500 sq ft London office. There are three years remaining on the lease. The business downsizes and wants another company to assume the lease.

If the office has a current EPC C that clearly relates to the same demise, and no substantial changes have been made to the property, there may be little difficulty from the current MEES perspective. The property is comfortably above today’s EPC E minimum.

Now change just one fact.

The same office is EPC F.

That changes the nature of the compliance review completely.

The landlord should establish whether the property is within scope of the regulations, whether any valid exemption exists, whether the EPC still reflects the building accurately and whether appropriate improvements could bring the asset to at least E.

The important point is not that every assignment involving an F-rated property will follow exactly the same route. The important point is that an F or G rating should never be treated as an administrative detail.

Subletting Can Be More Complicated Than Assignment

Subletting often introduces additional technical issues because the area being rented may be smaller than the original leased premises.

The tenant under the head lease remains in place, but grants a sublease of all or part of the accommodation to another occupier. GOV.UK describes subletting as letting all or part of the premises to another business while the original lease continues, subject to the terms of the lease and landlord permission. (GOV.UK)

Take a tenant occupying 15,000 sq ft over three office floors.

The tenant only needs two floors and wants to sublet the third.

The building already has an EPC, but that does not necessarily end the investigation.

The relevant question is whether the existing certificate properly reflects the accommodation being offered to the new subtenant.

The answer can depend on how the building is configured and serviced.

If the floor has its own entrance, separate fixed heating and cooling systems and can operate independently, the EPC position may differ from a floor entirely dependent on central landlord-controlled plant serving the whole building.

Government guidance specifically says that fixed services include heating, mechanical ventilation and air-conditioning systems attached to the fabric of the building, and that the EPC should reflect the fixed services actually installed. (GOV.UK)

This makes commercial EPC assessment in multi-let buildings a technical exercise rather than a simple document check.

Our Commercial EPC service can be used where the landlord, tenant or agent needs to establish what assessment is appropriate for the actual premises being assigned, sublet or marketed.

The EPC Must Match the Space Being Transacted

One of the most useful principles in the government guidance is that the EPC should generally reflect the accommodation being sold or rented. (GOV.UK)

That sounds obvious, but it becomes important in real commercial buildings.

A property may have originally been assessed as a single office. It may later have been divided into four suites.

A warehouse may have gained a large office element.

A mixed-use building may contain retail at ground level, offices above and residential accommodation elsewhere.

A landlord may have replaced central HVAC with individual systems for each floor.

A tenant may have subdivided part of its demise and installed additional cooling or ventilation.

In these situations, an old EPC may still appear on the register, but the practical question is whether it remains the correct certificate to rely upon for the transaction taking place now.

That is very different from simply checking whether the EPC is less than ten years old.

The age of the certificate matters, but the physical relationship between the certificate and the property matters too.

What Should Happen if the Property Is EPC F or G?

An F or G rating should prompt investigation before anyone starts specifying works.

The current rule for properties within the non-domestic MEES regime is generally EPC E or above, unless a valid exemption applies. (GOV.UK)

But the correct response to an F or G rating is not automatically to commission every improvement shown on the recommendation report.

First, understand why the property is at that rating.

The EPC may be old and the building may have been improved since the assessment. The rating may genuinely reflect poor-performing plant or fabric. A valid exemption may already exist. The property may have been reconfigured. The current certificate may relate to a different area. The building services may have changed substantially.

There are therefore two very different scenarios.

In the first, the landlord discovers an F rating but also finds that major lighting and HVAC upgrades have been completed since the EPC was prepared. A new assessment may materially improve the position.

In the second, the F rating accurately represents the building and no qualifying exemption exists. The landlord may then need a structured improvement plan before the property can reach the required minimum.

This is where our EPC Improvement Plans service becomes more useful than treating the EPC recommendations as a contractor shopping list.

A proper improvement plan should consider the building as a system: lighting, controls, heating, cooling, ventilation, fabric and the timing of future plant replacement all interact.

MEES Exemptions Need Evidence, Not Assumptions

A landlord should also distinguish between believing that an exemption should apply and actually having a valid exemption that can be relied upon.

Government guidance is clear that where an exemption applies, it must be registered before the landlord can rely on it. Registration is made on a self-certification basis and requires the relevant supporting evidence. (GOV.UK)

The current public register can also be searched for registered exemptions and penalties. (GOV.UK)

This matters during lease transactions because old assumptions can survive for years.

A property file may contain an email from a previous agent saying the building was “MEES exempt”. That is not necessarily enough.

The landlord should establish what exemption was relied upon, whether it was properly registered, whether the evidence still supports it and whether it remains valid.

If an assignment or subletting is underway, that check should happen early.

Where exemption support is needed, our MEES Exemptions service can help with the compliance pathway and evidence requirements.

You can also use the MEES Exemption Eligibility Checker as an initial screening tool before seeking a full property-specific review.

EPC Exemption and MEES Exemption Are Different Concepts

This point deserves particular attention because the terminology can be confusing.

A building may be outside the requirement to obtain an EPC in certain circumstances. That is an EPC question.

A different building may be legally required to have an EPC, fall within the MEES regime, but qualify for a specific MEES exemption because the minimum standard cannot be achieved under the applicable rules. That is a MEES question.

Those situations are not interchangeable.

The correct compliance logic should therefore move in sequence.

First determine whether an EPC is legally required.

Then establish which EPC applies to the building or part being transacted.

Then identify the rating.

Then determine whether non-domestic MEES applies to the tenancy.

Only after that should the landlord ask whether improvement is required or whether an exemption route is relevant.

This sounds procedural, but it prevents expensive mistakes.

Who Is Responsible for the Cost — Landlord or Tenant?

This is where statutory requirements meet the lease.

The law determines when an EPC is required and when MEES applies. The lease, however, may determine how rights, obligations and costs are allocated between the parties.

Commercial leases frequently contain provisions dealing with statutory compliance, repair, alteration, landlord access, tenant access, service charge, plant, reinstatement and consent.

The result is that the party with the regulatory responsibility may not necessarily bear every contractual cost in exactly the same way.

For example, a landlord may need the property to achieve a compliant position, but the lease may contain provisions relevant to tenant alterations or the cost of certain building services.

Conversely, a tenant may want to carry out works to facilitate an assignment but may not have the right to alter central HVAC or the external fabric without consent.

This is why questions about who pays cannot be answered properly by looking at the EPC alone.

We deal with this issue in more depth in our guide to who pays for commercial MEES upgrades — landlord or tenant.

The key practical point is to separate the technical compliance question from the contractual cost question rather than trying to solve both through the EPC report.

Can MEES Affect Landlord Consent to Assign or Sublet?

Whether a landlord can legally refuse consent to a specific assignment or subletting arrangement depends on the lease and the circumstances, so that part requires proper legal advice.

However, a prudent landlord should certainly understand the energy-compliance position before the consent process is completed.

Imagine a landlord receives an application for consent to assign a retail unit.

The tenant has already found an incoming occupier. Heads of terms are effectively agreed. Solicitors are instructed.

Only then does somebody discover the current EPC is F and no exemption is immediately apparent.

The landlord is now trying to answer several questions under transaction pressure: whether the current certificate is correct, whether the building can be improved quickly, whether a valid exemption route exists and what the lease allows the parties to do.

That is exactly the wrong time to begin the analysis.

A stronger asset-management approach is to integrate MEES into the landlord’s standard alienation process so that the property’s EPC and MEES status are checked as soon as the assignment or subletting application is received.

Why the Recommendation Report Should Not Become a Shopping List

One of the most common mistakes in EPC improvement work is treating the recommendation report as an instruction to install everything listed.

Commercial EPCs are based on the modelled energy performance of the building and its fixed services. Different improvements can interact, and the value of one measure can change once another measure is implemented.

Replacing old fluorescent lighting with efficient LED systems may be a sensible early measure in one building. In another property, outdated heating or cooling plant may dominate the EPC model. In a large office, control strategy and zoning may matter significantly. In an industrial unit, the building-services configuration may lead to a different priority altogether.

The commercial question is therefore not, “What is the longest list of upgrades we can carry out?”

It is, “What combination of sensible works gives us the compliance and asset outcome we actually need?”

That may be today’s EPC E minimum.

For another building, particularly a larger asset, it may make sense to plan beyond today’s minimum while major plant or refurbishment works are already being considered.

Our EPC Improvement Cost Calculator can provide an initial planning indication, but significant commercial assets should normally be reviewed individually.

Tenant Fit-Out Can Change the Picture

Commercial property rarely remains exactly as it was when the original EPC was produced.

Tenants modify lighting, install additional air-conditioning, create meeting rooms, build server rooms, alter ventilation, reconfigure floors and change how different parts of the premises are occupied.

Government guidance recognises modifications affecting separately occupied parts and fixed heating, ventilation or air-conditioning systems as relevant to EPC requirements. (GOV.UK)

That means a landlord dealing with an assignment should ask what has happened to the building since the current EPC was prepared.

Suppose the certificate is seven years old.

Since then, the occupier has installed a new air-conditioning system, converted part of the space to a server room and substantially upgraded the lighting.

The fact that the EPC still exists does not mean it is necessarily the best reflection of the property as it stands today.

Likewise, a landlord considering a subletting request involving newly partitioned accommodation should think about the new physical and servicing arrangement rather than simply relying on the historical certificate.

Assignment and Lease Renewal Are Not the Same for EPC Purposes

This is another area where generic online advice often becomes muddled.

Government EPC guidance distinguishes between transactions that trigger the EPC requirement and transactions that do not.

Assignment of a lease is specifically treated as requiring an EPC where the leasehold interest is being passed on. Subletting also requires an EPC to be provided. By contrast, the guidance identifies lease renewals or extensions among transactions that are not treated as a sale or rent for the purposes of triggering a fresh EPC requirement. (GOV.UK)

But this does not mean MEES disappears at renewal.

The MEES regime has its own rules, and the current minimum standard applies to relevant privately rented non-domestic properties even where there has been no change in tenancy. (GOV.UK)

That distinction is important:

An EPC transaction trigger is one issue.

Ongoing MEES compliance is another.

Our separate guide to commercial lease renewals and MEES compliance looks more closely at renewals.

What Happens if the Tenant Surrenders the Lease Instead?

A surrender is different from an assignment.

With an assignment, the tenant passes the lease to another occupier.

With a surrender, the landlord and tenant agree to bring the lease to an end.

GOV.UK describes surrender as ending the lease early by agreement between landlord and tenant. (GOV.UK)

A vacant building is not automatically required to be improved merely because the EPC is poor if the landlord is not currently planning to let it again. Government guidance explains that where a property is empty and there is no plan to let it, improvement does not need to take place until the landlord decides to let the property again. (GOV.UK)

Commercially, however, that does not mean waiting is always sensible.

A vacancy period can be the best time to improve lighting, replace plant, modify services or undertake other work without disrupting a tenant.

For an EPC F or G asset expected to return to the market, using the vacant period to establish the improvement pathway can be far easier than waiting until a new tenant is ready to sign.

A Realistic Assignment Example: EPC C Office

Consider a modern London office with an EPC C.

The tenant wants to assign the remaining term of the lease. The certificate is four years old, the same demise is being transferred, and no substantial alterations have been made since the assessment.

From the current MEES perspective, there is no obvious minimum-rating problem because the property already exceeds EPC E.

The landlord should still confirm that the EPC genuinely covers the premises being assigned and that no material change has occurred that affects the transaction.

But the energy-compliance work is likely to be proportionate and relatively straightforward.

That is what good compliance should look like: the relevant information already exists, the landlord understands the position, and the transaction does not become delayed by avoidable uncertainty.

A More Difficult Example: EPC F Retail Unit

Now consider a high-street retail unit rated EPC F.

The tenant has found an incoming occupier and wants to assign the lease quickly.

The landlord discovers that the lighting is old, controls are poor, the heating system has not been reviewed recently and no valid exemption can immediately be found on the register.

The wrong reaction would be to order every upgrade shown in the recommendation report without understanding what actually needs to change.

A more professional approach is to establish whether the existing EPC still accurately represents the premises, identify the measures most likely to move the building to a compliant position, consider whether the seven-year payback framework is relevant and understand whether any valid exemption route exists.

The objective is not maximum expenditure.

The objective is a defensible compliance pathway.

This is where combining a Commercial EPC assessment with a MEES Audit can be much more useful than treating them as isolated services.

A More Technical Example: Subletting One Floor of a Shared Office

Consider a tenant occupying three floors of a six-storey office.

The tenant wants to sublet one floor.

The building has central heating and cooling plant controlled by the landlord, but individual floors have some local control. There is one main reception, shared lifts and separate tenant electrical metering.

A historic whole-building EPC exists.

The correct question is not simply whether the certificate can be downloaded.

The landlord and tenant need to establish whether it appropriately reflects the actual space being offered to the subtenant.

Because the fixed services are shared, the assessment boundary and servicing arrangement matter. Government guidance specifically recognises the complexities created by multiple tenancies and shared or separate fixed services. (GOV.UK)

That is why more complex commercial buildings should be reviewed on their actual configuration rather than by using a generic rule such as “one floor equals one EPC”.

The Seven-Year Payback Test Can Matter for Commercial MEES

Non-domestic MEES includes a cost-effectiveness mechanism commonly referred to as the seven-year payback test.

This matters because commercial landlords are not simply expected to carry out unlimited expenditure regardless of whether an improvement is cost-effective.

The June 2026 government interim response also confirmed an intention to retain existing flexibility mechanisms, including the seven-year payback test and exemptions, as the policy develops. (GOV.UK)

For a landlord dealing with an F-rated building, this can therefore become part of the compliance analysis.

However, the existence of a payback test should not be reduced to a casual statement such as, “The works are expensive, so we are exempt.”

The relevant evidence and calculations need to support the position.

We cover this area separately in our detailed guide to the Commercial MEES 7-Year Payback Exemption.

Why Large Commercial Landlords Should Think Beyond EPC E

The current minimum standard remains EPC E for relevant non-domestic rented properties.

But the government’s June 2026 interim response sets out a more targeted future direction.

The stated intention is that from 2031, privately rented non-domestic buildings over 1,000 square metres in England and Wales would need to reach EPC B where cost-effective. Buildings below 1,000 square metres are intended to remain subject to the current EPC E minimum. The government also confirmed that the previously proposed EPC C milestone for 2027 will not be taken forward. Importantly, the higher standard for larger buildings still requires secondary legislation before it takes effect. (GOV.UK)

This changes the strategic conversation for larger assets.

Imagine a 3,500 m² office currently rated E.

If the landlord is about to replace the central plant anyway, it may be commercially shortsighted to ask only what is required to remain at E today.

The better question could be whether planned capital expenditure can be aligned with the likely future direction of the building.

That does not mean blindly spending money to reach B immediately.

It means looking at the property lifecycle rather than treating each compliance event in isolation.

Our guide to Commercial MEES EPC B 2031 for Buildings Over 1,000m² explains this new direction in more detail.

Mixed-Use and Multi-Tenant Properties Need Extra Care

Assignments and sublettings can become particularly difficult where the building contains several uses.

A ground-floor shop may sit beneath office accommodation.

Residential flats may occupy upper floors.

Different parts may have different services, separate entrances or entirely different EPC requirements.

There may also be several commercial tenants with different lease boundaries.

In that environment, relying on one old building-wide document without considering the actual transaction can lead to the wrong conclusion.

The best approach is to map the property physically and contractually.

What space is being transferred?

Who occupies it?

What fixed services condition it?

Does it operate independently?

Which certificate applies?

Only once those questions are clear should the MEES position be considered.

Our existing guide to MEES compliance for mixed-use properties goes further into that issue.

Why Managing Agents Should Build MEES Into Their Lease-Event Process

For a managing agent, the biggest practical problem is often not the regulation itself. It is fragmented information.

An assignment request arrives and somebody has to search old folders for the EPC.

Another person looks for evidence of previous improvement works.

The property manager asks whether an exemption was ever registered.

The facilities team has details of a replacement chiller, but nobody knows whether the EPC was updated afterwards.

Meanwhile, the tenant is pushing for consent.

A stronger system treats energy performance as part of the asset record.

The managing agent should already know the current EPC rating, expiry date, property configuration, MEES status, exemption position and any planned upgrades before a lease event becomes urgent.

For a landlord managing many properties, this is why Portfolio Compliance Management can become substantially more valuable than ordering EPCs one at a time.

The commercial advantage is not simply administrative neatness.

It is speed.

A landlord who can answer compliance questions immediately is in a much stronger position than one who starts investigating only after solicitors have been instructed.

Why Incoming Tenants Should Care About the EPC Too

Energy compliance is often framed entirely as a landlord issue, but incoming tenants also have a commercial reason to understand the property.

A low EPC rating may point toward older fixed services, inefficient controls or future improvement works.

Those issues may affect operating costs, comfort, disruption and potentially service-charge expenditure depending on the lease structure.

An incoming tenant should therefore understand what it is taking on.

A current EPC, the recommendation report, planned landlord works and the responsibilities for heating, cooling and other fixed systems can all form part of sensible due diligence.

For a major occupier taking a long lease, the question should not just be whether the building meets today’s legal minimum.

The tenant may also want to understand whether substantial improvement works are likely during its occupation.

A Better Way to Handle Assignment or Subletting

The best process is simple in principle.

As soon as an assignment or subletting is proposed, identify the exact premises involved and retrieve the current EPC.

Then compare the certificate with the building as it exists today.

Confirm the rating and whether the correct space is covered.

Establish whether MEES applies.

If the property is F or G, investigate the reason before committing to works.

If an exemption is being relied upon, verify that it is registered and supported.

If the building has been substantially altered, consider whether the existing assessment remains appropriate.

Only then should improvement work, reassessment or exemption strategy be decided.

This sequence prevents the most common mistake in MEES work: spending money before understanding the problem.

How MEES Compliance Can Help

MEESCompliance.co.uk is built around the full compliance pathway rather than simply producing certificates.

For landlords who already know they need an assessment, our Commercial EPC service provides the starting point.

Where the property has a poor rating or the position is unclear, a MEES Audit can help establish where the risk sits and what needs to happen next.

Where improvements are likely to be required, our EPC Improvement Plans are designed to create a more considered route toward the required rating.

If an exemption may be relevant, our MEES Exemptions service can help identify the evidence and registration pathway.

Owners and managing agents with multiple properties can use Portfolio Compliance Management to move from reactive certificate management toward a structured property-by-property compliance programme.

We also provide free initial tools including the MEES Compliance Checker, MEES Fine Risk Calculator, MEES Exemption Eligibility Checker and EPC Improvement Cost Calculator.

These tools are useful for initial screening, but complex commercial properties should still be reviewed individually.

The Practical Conclusion

A commercial lease assignment or subletting should never be treated as merely a change of occupier.

It is also an opportunity to confirm that the property’s EPC and MEES position are understood before the next stage of the lease begins.

The strongest landlords do not wait until completion week to discover an F rating.

They already know what certificate applies, whether the property is compliant, whether an exemption exists and what improvement strategy would be required if the position changes.

That becomes increasingly important as the commercial MEES regime develops. The current minimum remains EPC E for relevant non-domestic private rented property, but the government’s June 2026 position now points toward a proposed EPC B standard from 2031 for privately rented buildings over 1,000 m² where cost-effective, subject to the necessary secondary legislation. (GOV.UK)

For smaller buildings, today’s compliance position still matters. For larger buildings, today’s transaction should increasingly be viewed alongside the longer-term asset strategy.

If you are preparing a commercial lease assignment, subletting, re-letting or major lease event and are unsure whether the existing EPC is suitable, whether MEES applies or what should happen next, the safest approach is to resolve the issue before it becomes a transaction deadline.

Use our MEES Compliance Checker for an initial review, arrange a Commercial EPC assessment, request a MEES Audit or contact the MEES Compliance team.

The aim is not simply to produce another certificate. It is to understand the building, identify the correct compliance route and keep the property legally lettable and commercially usable without unnecessary work or last-minute surprises.

Understand what this means for your property.

Share your EPC and the letting or building question you need to resolve. Discuss the appropriate property review and next steps.

Explore a MEES audit

THE NEXT JOB STARTS WITH THE RIGHT CONVERSATION

Your property.
Let’s get it moving.

Arrange an EPC. Review the compliance. Plan the improvements.
Start a request and we’ll confirm the right scope and next step.

Call 0203 811 8331